Hydraulic Model Preparation Archives - Auerbach Engineering Corp.

Services: Hydraulic Model Preparation

Date of completion: 2014

The project includes the acquisition of the assets of the Lake Forest Water Company by the TCPUD, and the reconstruction of the water system within the Lake Forest Water Improvement District (LFWID) service area to meet Federal and State drinking water standards, as well as fire protection standards. The reconstruction project consisted of approximately 2,500 lineal feet (LF) of 10-inch pipe, 7,500 LF of 8-inch pipe, 600 LF of new 4-inch pipe, and 10,000 LF of small diameter and back-lot water mains. Water meters were installed with new service laterals to each customer, and 27 fire hydrants were installed within the right-of-way. The interconnection ties the new system to the existing TCPUD water supply and storage system, which surrounds the LFWID.

Date of completion: 2013

The project replaces an existing 2,500 LF small diameter tank line from the Four Season water tank to the Tahoe Woods Subdivision with 12″ tank line to provide fire flows that comply with the California Fire Code. The new line also provided electrical service to the water tank to enable the TCPUD to remotely monitor the water level inside the tank. Special considerations in this project include close coordination with the USFS. The water tank and waterlines are on USFS land acquired through the Burton Santini Act. A USFS Special Use Permit, including specific resources documentation and analysis as well as proper legal privilege was needed from the USFS and the Tahoe Woods Subdivision.

Project Gallery