Utility Design/Coordination Archives - Auerbach Engineering Corp.

Services: Utility Design/Coordination

Date of completion: 2015

The Truckee High School Track upgrade included the replacement of the existing track with a synthetic track surface, new restrooms, bleachers, and ADA compliant accessibility throughout. AEC tasks included storm drainage and water quality treatment for the new track as well as design and reconfiguration of three existing parking areas, drive aisles, walkways, and utility connections to the new restrooms.

Date of completion: 2015-2016

Sierra Expeditionary Learning School (SELS) is a K-8 public charter within the Tahoe Truckee Unified School District. AEC provided civil engineering design services to reconstruct the existing parking lot in order to improve access and parent and bus drop off. Improvements also included waterline and utility connections for the new Maintenance and Operations Building. AEC was responsible for design layout of the 3.6-acre site including much needed drainage improvements throughout.

Date of completion: 2004

Mr. Auerbach was Project Manager for civil design and infrastructure development for this destination resort development. AEC served as the team civil engineer and land surveyor for this 6-acre multi-family mixed use project. AEC prepared the project base maps, conducted utility surveys for relocation documents, prepared drainage analysis and reports in accordance with Placer County requirements, prepared final maps and condominium plans, and prepared construction documentation for roadways, drainage systems, and utility extensions/reinforcements. This was a complex multi-phase, multi-year development, coordinated with numerous regulatory agencies and utility providers. AEC was the engineer of record for the entire project from preliminary planning and tentative maps, through to construction and project closeout.

Project Gallery