Topographic and Design Surveys Archives - Auerbach Engineering Corp.

Services: Topographic and Design Surveys

Date of completion: 2010

This project was in coordination with the North Tahoe PUD Utility District, located within the Carnelian Bay and Tahoe Vista areas. AEC compiled a comprehensive list of the potential utility conflicts that could arise during construction of the Caltrans Erosion Control Project. AEC developed improvement plans for the relocation of gravity sewer systems and the water transmission pipelines. AEC also provided construction inspection services for the relocation of those facilities.

Date of completion: 2015

The Truckee High School Track upgrade included the replacement of the existing track with a synthetic track surface, new restrooms, bleachers, and ADA compliant accessibility throughout. AEC tasks included storm drainage and water quality treatment for the new track as well as design and reconfiguration of three existing parking areas, drive aisles, walkways, and utility connections to the new restrooms.

Date of completion: 2014

The project includes the acquisition of the assets of the Lake Forest Water Company by the TCPUD, and the reconstruction of the water system within the Lake Forest Water Improvement District (LFWID) service area to meet Federal and State drinking water standards, as well as fire protection standards. The reconstruction project consisted of approximately 2,500 lineal feet (LF) of 10-inch pipe, 7,500 LF of 8-inch pipe, 600 LF of new 4-inch pipe, and 10,000 LF of small diameter and back-lot water mains. Water meters were installed with new service laterals to each customer, and 27 fire hydrants were installed within the right-of-way. The interconnection ties the new system to the existing TCPUD water supply and storage system, which surrounds the LFWID.

Project Gallery