Preliminary Design Archives - Auerbach Engineering Corp.

Services: Preliminary Design

Auerbach was involved in this project since its inception, providing civil engineering and regulatory processing support to the design team of landscape architects. Commons Beach is a public park in the center of Tahoe city owned by the people of Tahoe City and held in trust by Placer County. Aging facilities and needs for environmental restoration triggered a public participation and consensus process for improvements to the park. Alternative design concepts were considered and resulted in the development of a strategic plan for the refurbishment of Commons Beach.

The project included a complete refurbishment of the park area. This involved upgrading the playground to meet current safety standards; relocation of the restroom building to a more accessible location; reconstructing the sewer pump station and force main; highway streetscape improvements including removal of existing boardwalk and railing, installation of a depressed walkway surfaced with concrete pavers and cable railing. Beach improvements included placement of 12,000 cubic feet of imported sand in former grassed areas. Shoreline stabilization was necessary to protect the beach, and a dynamic rock revetment was designed to mimic natural conditions. Other work included restoration and stabilization of the steep slopes and existing foot trail, providing ADA access to restrooms, interpretive displays of Tahoe history, a picnic terrace area and overlook areas, and a reconstructed parking area with advanced stormwater BMP’s due to proximity to Lake Tahoe.

Date of completion: 2003

Auerbach was involved in this project since its inception, providing civil engineering and regulatory processing support to the design team of landscape architects. Commons Beach is a public park in the center of Tahoe city owned by the people of Tahoe City and held in trust by Placer County. Aging facilities and needs for environmental restoration triggered a public participation and consensus process for improvements to the park. Alternative design concepts were considered and resulted in the development of a strategic plan for the refurbishment of Commons Beach.

Date of completion: Fall 2012

The wetland mitigation project represents a collaboration between the North Tahoe Fire Protection District (NTFPD) for impacts associated with their new fire station, and the Tahoe City Public Utility District (TCPUD) for impacts associated with the Lakeside Trail. AEC identified a joint project that would address feasible and appropriate mitigation needs for both sets of impacts. The Station 51 original relocation project included site work for a 20,000 square foot public safety center including roadway improvements to Fairway Drive, parking, new utilities and utility relocations, and a storm water collection and treatment system. The Lakeside Trail is the final one-mile segment in the largest paved trail system at Lake Tahoe connecting the existing multi-purpose trails through a highly constrained urban core of Tahoe City, along the lake shore. The purpose of this project was to mitigate the permanent and temporary impacts to existing wetlands. The project area that was selected meets the criteria set forth by current U.S. Army Corps of Engineers Final Mitigation Guidelines and Monitoring Requirements, and as mandated by the Water Quality Certification Permits (401 Permits) issued for both the NTFPD and TCPUD projects. The mitigation project is currently being monitored annually by AEC and its biological subconsultants.