Ground Control for Aerial Mapping Archives - Auerbach Engineering Corp.

Services: Ground Control for Aerial Mapping

Date of completion: 2008

This project consisted of ground control and aerial mapping for over 2,200 acres of ranch land for planning of future wastewater conveyance and storage facilities. Deliverables included #D, 2D and DTM mapping files in AutoCAD format on a horizontal datum NAD83 and vertical datum NGVD29, as well as digital color ortho-photography at 0.25-foot pixel.AEC was contracted to map the project area consisting of 2,200 acres.

Date of completion: Current

The Martis Valley Trail (MVT) is part of a planned 62-mile trail network referred to as the “Resort Triangle.” Covering about 9 miles, the MVT section extends between Truckee and the Tahoe Basin. MVT is being completed in phases, X of which AEC has contributed to in various capacities. Our Planning, Surveying, and Engineering teams have provided background reviews, compliance assistance, surveys and mapping services, civil design, and several other services for this section of the multi-use trail. See our other project descriptions for our services on other sections of the trail connecting the resorts and communities in our area.

Project Gallery