Civil Design and Cost Estimating Archives - Page 2 of 2 - Auerbach Engineering Corp.

Services: Civil Design and Cost Estimating

Date of completion: 2015

The Truckee High School Track upgrade included the replacement of the existing track with a synthetic track surface, new restrooms, bleachers, and ADA compliant accessibility throughout. AEC tasks included storm drainage and water quality treatment for the new track as well as design and reconfiguration of three existing parking areas, drive aisles, walkways, and utility connections to the new restrooms.

Project Gallery