Services: Bid Phase Services

The project included constructing approximately 1,679 lineal feet (LF) of 8-inch waterline, 143 LF of 4-inch waterline, 532 LF of 2-inch waterline, 5 fire hydrants, and 23 water service laterals. The project was necessary to improve fire hydrant spacing and fire flow rates in conformance with California Fire Code 2010 within the McKinney Tract and the Placer County ROW. The project included approval from Caltrans for an open cut trench for installation of the waterline in Highway 89 right-of-way.

Date of completion: 2008

Project Description: Construction of a replacement sewer pump station for the Grove Street Pump Station including the construction of a new Harbormaster building. This project included a new pump station and associated gravity sewer line, 305’ of 30” sewer line and 615’ of 6” dual force main connecting to an existing sewer main under SR 28.

Date of completion: Fall 2012

AEC prepared a BMP work plan to improve/restore function of existing drainage, treatment and disposal systems as well as design additional facilities/treatment including drip line trenches, curbs, snow storage area, including revegetation and mulching. Review and evaluation of previous construction plans, and existing digital mapping resources were utilized to streamline this project and minimize costs.

Date of completion: 2012

Prepare BMP work plan to comply with TRPA’s request to come into compliance with TRPA requirements regarding onsite water quality treatment and BMP installation.