Four Seasons Tank Line Replacement - Auerbach Engineering Corp.

Four Seasons Tank Line Replacement

Date of completion: 2013

Description: The project replaces an existing 2,500 LF small diameter tank line from the Four Season water tank to the Tahoe Woods Subdivision with 12″ tank line to provide fire flows that comply with the California Fire Code. The new line also provided electrical service to the water tank to enable the TCPUD to remotely monitor the water level inside the tank. Special considerations in this project include close coordination with the USFS. The water tank and waterlines are on USFS land acquired through the Burton Santini Act. A USFS Special Use Permit, including specific resources documentation and analysis as well as proper legal privilege was needed from the USFS and the Tahoe Woods Subdivision.
Client:

Tahoe City Public Utility District

Project Gallery